Louisiana Civil Code

Table of Contents (Download PDF)

SECTION 3 - OF CONSTRUCTING BUILDINGS ACCORDING TO PLOTS, AND OTHER WORKS BY THE JOB, AND OF FURNISHING MATERIALS

Art. 2756. To build by a plot, or to work by the job, is to undertake a building or a work for a certain stipulated price.

Art. 2757. A person, who undertakes to make a work, may agree, either to furnish his work and industry alone, or to furnish also the materials necessary for such a work.

Art. 2758. When the undertaker furnishes the materials for the work, if the work be destroyed, in whatever manner it may happen, previous to its being delivered to the owner, the loss shall be sustained by the undertaker, unless the proprietor be in default for not receiving it, though duly notified to do so.

Art. 2759. When the undertaker only furnishes his work and industry, should the thing be destroyed, the undertaker is only liable in case the loss has been occasioned by his fault.

Art. 2760. In the case mentioned in the preceding article, if the thing be destroyed by accident, and not owing to any fault of the undertaker, before the same be delivered, and without the owner be [being] in default for not receiving it, the undertaker shall not be entitled to his salaries, unless the destruction be owing to the badness of the materials used in the building.

Art. 2761. If the work be composed of detached pieces, or made at the rate of so much a measure, the parts may be delivered separately; and that delivery shall be presumed to have taken place, if the proprietor has paid to the undertaker the price due for the parts of the work which have already been completed.

Art. 2762. If a building, which an architect or other workman has undertaken to make by the job, should fall to ruin either in whole or in part, on account of the badness of the workmanship, the architect or undertaker shall bear the loss if the building falls to ruin in the course of ten years, if it be a stone or brick building, and of five years if it be built in wood or with frames filled with bricks.

Art. 2763. When an architect or other workman has undertaken the building of a house by the job, according to a plot agreed on between him and the owner of the ground, he can not claim an increase of the price agreed on, on the plea of the original plot having been changed and extended, unless he can prove that such changes have been made in compliance with the wishes of the owner.

Art. 2764. An exception is made to the above provision, in a case where the alteration or increase is so great, that it can not be supposed to have been made without the knowledge of the owner, and also where the alteration or increase was necessary and has not been foreseen.

Art. 2765. The proprietor has a right to cancel at pleasure the bargain he has made, even in case the work has already been commenced, by paying the undertaker for the expense and labor already incurred, and such damages as the nature of the case may require.

Art. 2766. Contracts for hiring out work are canceled by the death of the workman, architect or undertaker, unless the proprietor should consent that the work should be continued by the heir or heirs of the architect, or by workmen employed for that purpose by the heirs.

Art. 2767. The proprietor is only bound, in the former case, to pay to the heirs of the undertaker the value of the work that has already been done and that of the materials already prepared, proportionably to the price agreed on, in case such work and materials may be useful to him.

Art. 2768. The undertaker is responsible for the acts of the persons employed by him.

Art. 2769. If an undertaker fails to do the work he has contracted to do, or if he does not execute it in the manner and at the time he has agreed to do it, he shall be liable in damages for the losses that may ensue from his non-compliance with his contract.

Art. 2770. Masons, carpenters and other workmen, who have been employed in the construction of a building or other works, undertaken by the job, have their action against the proprietor of the house on which they have worked, only for the sum which may be due by him to the undertaker at the time their action is commenced.

Art. 2771. Masons, carpenters, blacksmiths and all other artificers, who undertake work by the job, are bound by the provisions contained in the present section, for they may be considered as undertakers each in his particular line of business.

Art. 2772-2776. [Repealed by Acts 2019, No. 325, §3.] 

Art. 2777. Workmen employed in the construction or repair of ships and boats, enjoy the privilege established above, without being bound to reduce their contracts to writing, whatever may be their amount, provided the statement of the claim is recorded in the manner required by law; but this privilege ceases, if they have allowed the ship or boat to depart, without exercising their right.




Provide Website Feedback / Accessibility Statement / Accessibility Assistance / Privacy Statement